There has been some more progress on several fronts. I have the main casing built for the above toilet cabinet in the basement and the gas line soffit is constructed and installed. Now I can go through and caulk and patch over the screws and get some paint/texture on the walls. Then soon the floor can go in, thus allowing the toilet to go back in, yay!

Yesterday a project got done that has only been waiting about a year, the threshold from the kitchen toward the bathroom and bedroom. The one leading toward the front door by the fridge still needs to be done, but that will take more effort as I have to build that one from scratch. The sub-floor is uneven in that spot and I can't use the color-matched ones that came with the floor. Now I can also put in the moulding along the wall to cover the gap that you can see in the picture. The moulding is already constructed and stained so now I just need to trim it to fit.
That installation is next on the list for today, then I need to go out and get more drywall patching compound and have at the basement bathroom, with any luck I might even be able to get some paint on it tonight or tomorrow.
Designs are also moving along on the upstairs bathroom cabinetry. The sink and faucet have been ordered and should be here early next week. I should order the material for the door inlays soon, but that requires a phone call or fax as they don't have a web ordering system. I did some pricing on maple plywood and boards and now need to see what I need to buy for stock in order to make all of the parts on the cutsheet. I also borrowed a pair of biscuit jointers from
revchris to try out before possibly using them to construct the cabinets.
Well, back to work.