Well mostly. There is still some stuff in the kitchen and a few random things left in
creeksideway. Then there is the garage to deal with. That will be a back the trailer and van up and shovel it in kind of move I think.
Kitchen pictures have been added to the gallery, the range hood is in and working The ducting still needs to be connected to the roof, but that will be done when the ridge vent goes in and then the bath vent will be redirected as well.
The kitchen needs just a bit more paint, and then the counter and cooktop can go in along that wall. The rest of the place is almost fully painted as well, with just the little hall section by the bedroom and the half bath left to go. A picture of the computer room paint (same color as the bedroom) has also been added to the paint gallery.
Many thanks to
graydancer and his daughters for helping last week and
sculplady and FootInMouth for helping this weekend.
Tonight it is back to get another load from the condo.
(updated by
jeffreyp.)
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
Kitchen pictures have been added to the gallery, the range hood is in and working The ducting still needs to be connected to the roof, but that will be done when the ridge vent goes in and then the bath vent will be redirected as well.
The kitchen needs just a bit more paint, and then the counter and cooktop can go in along that wall. The rest of the place is almost fully painted as well, with just the little hall section by the bedroom and the half bath left to go. A picture of the computer room paint (same color as the bedroom) has also been added to the paint gallery.
Many thanks to
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
Tonight it is back to get another load from the condo.
(updated by
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)