Tub placed.

Oct. 8th, 2007 10:34 am
manleyhouse: (Default)
Saturday I cut off the conduit and snaked the wire for the tub, then [livejournal.com profile] multibear and I rolled the tub over to its proper location. I then proceded to remove the control system and heater to look into what wasn't working. I have a new heater element on order and will be doing some cleanup on the rest of the internals.

Sunday I rotated the cover and lifter to be on the garage side. I then moved some leaves to the front yard to get a jump on cleaning up the driveway concrete in the back. I've also started looking into a new cover for the tub to replace the current concave and cracking one. The new ones have a sloped top with reienforcements for the lifters and a rather high R-24ish value, and cost about $500 including shipping. I also need to start thinking about step options to get into the tub.
manleyhouse: (Default)
Today the concrete was poured. Pictures were taken.

The forms come off tomorrow morning and then I have to go and backfill all of the edges. They said it should be good to walk on tomorrow and the tub can go on in a week or so.

Profile

manleyhouse: (Default)
manleyhouse

July 2009

S M T W T F S
   1234
56 7891011
12131415 161718
19 202122232425
262728293031 

Syndicate

RSS Atom

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated May. 23rd, 2025 05:13 am
Powered by Dreamwidth Studios