Haven't gotten the floor transitions done yet, or the cabinet toe-kicks. I have trimmed and removed all of the edge staples from the carpet and now I just need to staple them back down, once I find a carpet stapler. Then I can put in the transitions. The toe-kicks need to be trimmed down so I am looking around for the best method of doing that so those can go up. Then the majority of the kitchen will be completed. It will still need a cabinet face on the small cabinet and the cutting board on the end of the counter but most of the building will be done after the baseboards are in. Woo! Now we just need to get the table in by the end of the year.
After the kitchen is taken care of then some of the energies can go into doing something with the basement. I've already whipped up the current layout in the 3d home design software that our real-estate agent gave us after the closing so I can play with what will and will not work.
First will be moving one of the beam support poles over about 2-3 feet and shoring up the other side if needed. That will open up the 'finished' area of the basement and allow for un-obstructed viewing of the projection screen, only 16mm for now, with the goal of a DLP short throw projector hooked up at some point.
Then the laundry phase looks like it involves.
That will free up a lot of space in that area of the basement and make a lot more usable space. It will also make a hopefully sane laundry area as opposed to what we have now.
Then after that, efforts will go toward installing a shower stall next to the toilet that is currently down there. That will take a bit more doing. But once that is done we can think more about the upstairs bath as there will be a place to shower during work on that one.
Sometime in there we should also do something about the lack of window coverings in the back room. I'm thinking about making the roman shades myself, need to price out the hardware and materials and see if it is worth it.
Although before the things that require much money happen the kitchen needs to be paid off.
(updated by
jeffreyp)
After the kitchen is taken care of then some of the energies can go into doing something with the basement. I've already whipped up the current layout in the 3d home design software that our real-estate agent gave us after the closing so I can play with what will and will not work.
First will be moving one of the beam support poles over about 2-3 feet and shoring up the other side if needed. That will open up the 'finished' area of the basement and allow for un-obstructed viewing of the projection screen, only 16mm for now, with the goal of a DLP short throw projector hooked up at some point.
Then the laundry phase looks like it involves.
- Removing an un-needed waste drain (we think it was for emptying an RV) and replacing it with a washing machine drain stack
- Tapping the water lines near that drain stack for a washing machine
- Re-positioning the dryer outlet
- Getting the new washer and dryer
That will free up a lot of space in that area of the basement and make a lot more usable space. It will also make a hopefully sane laundry area as opposed to what we have now.
Then after that, efforts will go toward installing a shower stall next to the toilet that is currently down there. That will take a bit more doing. But once that is done we can think more about the upstairs bath as there will be a place to shower during work on that one.
Sometime in there we should also do something about the lack of window coverings in the back room. I'm thinking about making the roman shades myself, need to price out the hardware and materials and see if it is worth it.
Although before the things that require much money happen the kitchen needs to be paid off.
(updated by
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)