Current Status
Oct. 17th, 2006 09:46 amNo massive progress since the last update, just a few more smaller things worked on, and the vehicles taking away most of the non-existant fundage. However, the welding cart looks like something, and the mitersaw station is getting there. I've also been slowly using up some of the sheet goods that were taking up a good chunk of space, started a cart for
pkstudios, that got rid of a 4x8 sheet of melamine and opened up a lot of space.
Last night I managed to find the partial sheet of green-board that was in the stack I could get to, and made another trim piece for the basement shower. It is almost to the point that I can do some mudding and caulking and get some paint on the walls, although I need to finish a soffit for the stove gas-line first. I then marked up some MDF scrap that I am going to turn into a cabinet for above the toilet downstairs. I've also come up with a plan to get a sink in the basement bathroom when the laundry area gets re-arranged possibly next year.
The plan that is formulating is to try and get as far as I can with the basement bathroom and prep for the upstairs before the week of Thanksgiving and see if my dad wants to come down and help while
alyska is off to her parent's place. Then we might be able to do the big push in the upstairs bathroom. Granted for that push to be able to happen I should have the wall cabinet made and have the components like the sink and faucet in hand by then. And as long as I'm pipe-dreaming it would be good to have the base cabinet and counter made by then as well. I need to stop by Marling Lumber one of these days and see what they have for cabinet grade maple plywood and solid maple lumber for the cabinets. And also because I haven't managed to make it in there yet, and really I should have a while ago, even more so now that I am looking a making decent furniture type projects.
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
Last night I managed to find the partial sheet of green-board that was in the stack I could get to, and made another trim piece for the basement shower. It is almost to the point that I can do some mudding and caulking and get some paint on the walls, although I need to finish a soffit for the stove gas-line first. I then marked up some MDF scrap that I am going to turn into a cabinet for above the toilet downstairs. I've also come up with a plan to get a sink in the basement bathroom when the laundry area gets re-arranged possibly next year.
The plan that is formulating is to try and get as far as I can with the basement bathroom and prep for the upstairs before the week of Thanksgiving and see if my dad wants to come down and help while
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)