Nov. 21st, 2006

More tile.

Nov. 21st, 2006 11:15 am
manleyhouse: (Default)
Now comes the *fun* part of getting out the tile saw and making the holes for the plumbing and the trim bits for the ends to replace the current spacer tiles. While I was doing that my dad put in the replacement beam support in the basement so we can move the one that is inconveniently placed on the finished side. Well, off to go cut some tile so we can hopefully get to grouting tomorrow or so.
manleyhouse: (Default)
Tile is done, now to wait at least 24 hours to put in the grout. It took way too long to wear the holes in the tile for the faucet handles. The second one took about an hour and a half. While dad was working at that with the drillpress I made most of the face frame for the vanity base cabinet, including the half-lap joints. I still need to make half of three of the joints because I didn't have the dimension for the top drawers out in the garage when I was working on it. Those will get done tomorrow when I go out and finish tweaking the rest of the joints as well in preparation for gluing and clamping.

Tomorrow is going to start out with a trip into the attic to re-fish the wire for the cabinet light and most likely fish new wire and install a bracket for the fan in the bedroom. Then it will be out to the garage for me to work on the aforementioned face frame then I will be doing some dye testing on the various woods to make sure it covers well and is a good color. During that time dad will be doing the bedroom fan install and wiring up the switches and outlet in the bathroom. He might also head out to the garage and engrave my initials into all of my tools. (J\P)

Profile

manleyhouse: (Default)
manleyhouse

July 2009

S M T W T F S
   1234
56 7891011
12131415 161718
19 202122232425
262728293031 

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated May. 24th, 2025 10:06 pm
Powered by Dreamwidth Studios