Tile is done, now to wait at least 24 hours to put in the grout. It took way too long to wear the holes in the tile for the faucet handles. The second one took about an hour and a half. While dad was working at that with the drillpress I made most of the face frame for the vanity base cabinet, including the half-lap joints. I still need to make half of three of the joints because I didn't have the dimension for the top drawers out in the garage when I was working on it. Those will get done tomorrow when I go out and finish tweaking the rest of the joints as well in preparation for gluing and clamping.
Tomorrow is going to start out with a trip into the attic to re-fish the wire for the cabinet light and most likely fish new wire and install a bracket for the fan in the bedroom. Then it will be out to the garage for me to work on the aforementioned face frame then I will be doing some dye testing on the various woods to make sure it covers well and is a good color. During that time dad will be doing the bedroom fan install and wiring up the switches and outlet in the bathroom. He might also head out to the garage and engrave my initials into all of my tools. (J\P)