The floor went in last night. Yesterday started with heading over to my uncles place to use his table saw and radial arm saw. The first to rip the plywood to size for the wall cabinet and cut the counter block to size. The second to make the half lap joints for the face frames. After getting home I went to put the floor in but realized that this line of flooring didn't have the built in pad like the last two I put it. So, that got postponed. Instead I went and sanded, scraped and routed the countertop and assembled the base cabinet face frame before the almost daily shopping trip and dinner. Shopping was some "bone" caulk for the vertical corners and around the tub, a roll of underlayment for the floor, and a humidifier filter. After returning home I installed the floor and went to bed.