Dec. 21st, 2006

manleyhouse: (Default)
Much progress today. The lower part of the wall cabinet case is all dyed and some of it just got the third coat of lacquer (still wet in the picture, will dry to semi-gloss). The two pieces in the background will get lacquered tomorrow along with the other sides of the foreground pieces. Before I started with the dye and the lacquer I trimmed the parts to final dimensions and cut the dado and rabbet joints. I also drilled all of the holes for the adjustable shelf supports. Then I glued on the upper and lower tracks and glued and biscuit joined the solid face for the center vertical support to help hold in the shelves and hide the edge of the plywood. The heaters currently have that area of the garage about 20 degrees higher (60) than the outside temp (40), for this project I am glad it isn't a white December yet.

While waiting for glue and lacquer to dry today I also cut and put up a shelf above the West window supported by the two wall cabinets. Not sure what is going to go there yet but it seemed like a good use of that space.

Profile

manleyhouse: (Default)
manleyhouse

July 2009

S M T W T F S
   1234
56 7891011
12131415 161718
19 202122232425
262728293031 

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated May. 24th, 2025 10:06 pm
Powered by Dreamwidth Studios