The tile has been going slowly the last week or so, so slow infact that nothing was done. That changed today. Tile was cut and installed to almost fill in the back and bedroom walls. the bullnose still needs to go on the bedroom wall and there is one tile that needs to go in the upper corner of the back wall. It is cut and will go up with the next batch of mortar that is mixed up. There is still the bottom row of tiles that needs to be installed all the way around as well, but I need to come up with a plan of attack on that. Seems I started the rows a touch too tall. oops. We picked up the grout and sealer the other day so now I just need to keep at it and finish it. The next step is to cut out around the faucet controls, then it should go quickly up the wall until I need to cut out for the shower head. After all of that and the fitting to the cabinet I will need to go around and do the bottom row, which will involve cutting around the faucet.
The window boxes also found a more prominent home today. We had picked up some L brackets to mount them with when we got the grout. Today I painted them white and we attached them to the front porch rail after
alyska got home.
We also picked up a seal for the bottom of the new door on the garage. I trimmed that down and attached it this afternoon as well. I also did a little bit of general cleanup of the garage and along the fence. A few days ago I also finally got around to cleaning out the watering can that was in the garage when we moved in. I then proceeded to mix up some Ground-Clear and applied it to the side and back of the garage where the weeds have been running rampant. It seems to be doing the trick.
(updated by
jeffreyp)