Nov. 3rd, 2006

manleyhouse: (Default)
Monday I put a coat of white on the ceiling in the bathroom downstairs. Then last night I put the rest of the can up on the walls, it didn't quite cover so I'll be stopping on the way home to pick up some more paint and give the walls another coat.

On the upstairs front, the sink and faucet arrived Monday and Tuesday. Damn is that sink cool. A slight change might be made for the counter. The river-rock and epoxy one that was planned might have to wait a little and instead we might do a butcher block mahogany that I have in the garage. The counter should be easy enough to swap out later when we have time to make the epoxy poured top, there is just one hole for the sink as the faucet will be mounted in the wall.

Talked over the plan some more with my dad and started the list of things he should bring with if he can. I still need to decide if I want to try and take few days off around thanksgiving to give me even more time for the bathroom that week that he will be down. As it is I'm trying to get everything in the house and staged that I can so we don't waste a lot of time running to get things. Although we will have to do that at the start for the plumbing as I'm not going to be exposing that much of it before we start, I'd like to keep the bathroom functional at least until [livejournal.com profile] alyska heads out for Thanksgiving.

The list for this weekend is as follows:

  • finish painting basement bathroom walls (Friday)
  • make shelves and paint cabinet for basement bathroom (Saturday)
  • begin tearing out the upstairs wall cabinets and measure for new one and adjust design (Sunday)

Profile

manleyhouse: (Default)
manleyhouse

July 2009

S M T W T F S
   1234
56 7891011
12131415 161718
19 202122232425
262728293031 

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated May. 25th, 2025 05:29 am
Powered by Dreamwidth Studios