List mostly accomplished.
Nov. 5th, 2006 10:12 pmWell the first two things on the list were accomplished, and because the weather was nice a bunch of other things were done instead of the third.
Friday I painted the walls so now everything is white. Saturday afternoon the cabinet got shelves and moved to the basement. It didn't get painted due to a slight change in schedule. Instead the cabinet got two coats of paint and installation on Sunday. The upstairs bathroom cabinets didn't get touched, maybe sometime this week.
This morning the weather was nice enough that I decided to work outside instead of in the basement.
apocalyptikitty and
feloniouscat were thrilled because it meant they could spend a few hours in the backyard.
The motorcycles got winterized, re-positioned and covered. The lawn mower and snow blowers swapped places and were checked out. Then I made another big pile of leaves for the city to take away. After some more cleaning and planning in the garage I went downstairs and put a coat of paint on the cabinet. After the second coat wasn't tacky anymore I put it up on the shelf and screwed it to the wall stud where it will be staying. It might get doors sometime, but not right now.

This morning the weather was nice enough that I decided to work outside instead of in the basement.
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
The motorcycles got winterized, re-positioned and covered. The lawn mower and snow blowers swapped places and were checked out. Then I made another big pile of leaves for the city to take away. After some more cleaning and planning in the garage I went downstairs and put a coat of paint on the cabinet. After the second coat wasn't tacky anymore I put it up on the shelf and screwed it to the wall stud where it will be staying. It might get doors sometime, but not right now.