May 27-30 {KITCHEN}
May. 31st, 2005 11:02 am![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
Friday evening my dad and I went to Sears to pickup the oven and freezer that I had ordered. Then we stopped by Menards for some drywall, plywood and countertops.
I managed to drop the 5/8" plywood on my right foot. ow. We got everything home and unloaded, then did some stuff. Then it was to sleep for the early morning departure.
Early start on the road to IKEA. Tolls with a trailer are expensive. Got there shortly after 9am and treked right up to get a few glasses and order the kitchen. Turns out the door style we wanted wasn't a stocked color, so the doors and faceplates will be at the store in about 2-3 weeks or so. When the person that was helping me order them was almost done, he was informed that they don't do split orders, they order everything so it is in then you pick it all up at one. He was almost done splitting up the cases in a pick up today order and the doors and panels in a distribution order so I was still able to bring back all but 2 of the upper cabinets on this trip. Those two will come in with the doors. went down to the pickup desk and got the 4 flat bed carts of stuff and wheeled it out to the van. Turns out everything fit in the van with room to spare (volume, not weight). We didn't need the trailer although it was good to have along just in case, even though it more than doubled the tolls, $20 there and back.
We unloaded all of the boxes into the sun room then
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
Headed over early and marked out counter height lines with a laser-level so we could then reference up and down for the cabinet rails without worrying about the ceiling or floors. Put together most of the cabinet cases so we could get accurate measurements for things.
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
Ran flexible gas line for the cook-top, purchased new sink and fittings. We fitted the lower cabinets, with most of them anchored to the wall waiting for final leveling and attachment.
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
Images on the weekend progress were added in the gallery. Newest crop start on the second page.
Tonight is a furniture delivery between 4 and 8pm, and most likely some base cabinet anchoring and leveling, with a possible counter fitting for the cook-top in there as well.